bg
Engul

Rúbanisko II boiler house – Lučenec

Location of the realisation: Lučenec(Slovakia)
 
Date of the realisation: 2020
 
Total power: 800 kWe
 
The company Engul, s.r.o. participated in the project “Modernization of the heating plant Rúbanisko II” for the company Veolia Energia Lučenec, as (Slovakia).
 
This project consisted of technology design, construction, manufacturing, installation, commissioning, and warranty service for an engul 1000 GACF cogeneration unit (CHP) installed in a boiler room in a soundproof enclosure. Engul also ensured the supply of a transformer and a high-voltage switchboard, equipment used to output electricity from the generator (at a voltage level of 22 kV).
Heat output of cogeneration: 861 kWt.
 
The cogeneration unit was successfully put into operation, tested during March 2021. The electrical energy produced by the cogeneration unit is supplied to the distribution network, and the produced heat is distributed by the central heat supply system (CZT) in Lučenec.

Location of the realisation
Boiler room Rúbanisko II - Lučenec)


Date of the realisation


Total power
2x 800 kWe

Back to all references

Announcement for offers

Sorry, this entry is only available in Slovak and Russian.

read more

Engul received a grant

Engul, s. r. o. has received a grant of EUR 141,899.83 from the Research and Innovation Program (OPVaI-MH/DP/2016/3.3.1-04) of the Ministry of Education, Science, Research and Sport of the Slovak Republic, represented by the Ministry of Economy of the Slovak Republic, co-funded by the European Fund regional development. The strategic goal of the project to […]

read more